Monday, July 8, 2013

Day 24: July 5, 2013

As the previous day, I spent most of my day working on GIS. I finish the ArcMap analysis and I now have the population density for each segment of my route. I started the excel part of the analysis but I want to move on with the presentations so next week I'm planing to work mainly on the ppts. 

On the afternoon, I kept working on the GIS automatization tool. I finish it by the end of the day and it will only require some testing to make sure that it works properly. If I have time by the end of the program I will try to automatize also the excel calculations of the risk analysis but my priority right now is to finish both my case study and the ppt modules. 

Today:
-Work on presentation 2: Rail Hazardous Material Transportation                        (to be finished)
-Work with ArcMap to obtain the population density along the route                    (done)
-Develop a tool to automatize the GIS process                                                  (done)
-Literature review on the evaluation and analsyis of crude oil transportation risk    (to be finished)

Next day:

-Work on presentation 2: Rail Hazardous Material Transportation                                
-Literature review on the evaluation and analsyis of crude oil transportation risk